In 2022, an international mining company specialising in nickel and cobalt approached Advanced Piping Systems for assistance in a time-sensitive project related to their mine expansion.

A case study about the mining project

The company’s Queensland Area Sales Manager, Andrew Chawynski, explained that the client needed support with an offshore project aimed at increasing their nickel production to meet rising global demand driven by its use in batteries and cars.

Reputable supply chain sealed the deal

The primary challenge was to fulfill quality assurance (QA) documentation requirements while adhering to tight deadlines and accommodating international time differences. 

Andrew emphasized the significance of time management in meeting the project’s demands, as the client required the installation of prefabricated products during critical shutdowns at their mine. This meant ensuring the completion and shipment of prefabrication, fittings, and pipe supply within strict timelines.

To meet these requirements, Advanced Piping Systems undertook prefabrication in Adelaide, allowing them to maintain control over product quality and packaging. Critical path inspections were also conducted by the client’s consulting engineer at the Adelaide site.

The prefabricated product was then loaded, containerised, and shipped, enabling Advanced Piping Systems to manage packaging quality and optimise freight, resulting in cost savings for the client.

The client chose Advanced Piping Systems due to our reputation for prefabrication, timely delivery, and adherence to budget constraints. 

The consultant who recommended Advanced Piping Systems was familiar with our expertise in export, prefabrication, and moulded fittings, as well as our reliable supply chain. 

This solid and high-quality supply chain, along with the company’s reputable overseas and local suppliers and efficient staff, made them an ideal partner for the project.

Our digital capabilities played a crucial role in eliminating delays

Advanced Piping Systems’ digital capabilities played a crucial role in demonstrating professionalism and providing peace of mind to the customer, as they ensured we were able to supply QA documents in real time, electronically. 

Communication challenges, such as international language barriers, were overcome by professional translators so our wording made sense to the customer. This approach minimized the risk of communication errors that could lead to delays.

The provision of prefabricated products ensured high quality and facilitated seamless and timely installation. Advanced Piping Systems maintained precision and adhered to industry tolerances, following the provided drawings. Consequently, the products could be installed without delay upon arrival at the overseas site.

A timely delivery

Despite disruptions caused by COVID-19 and freight constraints, Advanced Piping Systems successfully delivered the project on time and without any disruption to the supply chain or mining production downtime. Our strong supply network enabled us to overcome these challenges. 

As a result of this exemplary performance, the growing mine has engaged Advanced Piping Systems for future prefabrication works, serving as a testament to the team’s hard work and reliable delivery.

Related Articles

Built like a tank! Another HDPE prefabrication success story

advanced piping systems advanced poly fabrication Butt Welding chemical handling standards chemical industry piping chemical process applications chemical resistance custom HDPE fabrication custom lifting systems custom pipeline solutions customised tank solutions engineering firm collaboration environmental safety Extrusion Welding HDPE fabrication services HDPE for chemical storage HDPE Piping HDPE specialists Australia hydrochloric acid tank hydrostatic test plans hydrostatic testing industrial fabrication services industrial piping solutions industrial QA compliance mining and resources projects poly pipe fabrication polyethylene coated steel polyethylene pipe systems prefabrication solutions quality assurance standards safe chemical storage

With excellent chemical resistance, HDPE (or poly pipe) can be used in a wide range of chemical processes and applications. Recognising this, in late 2022, …

The APS bracket spacing support tool

Thanks to its flexibility and low weight, PE pipe is well-suited for many ‘above-ground’ applications, requiring both horizontal and vertical suspension. When suspending PE pipe, …

Why PE Pipes are more environmentally friendly than PVC pipes

HDPE Mining PE Pipe sustainability

High-density Polyethylene (HDPE) pipes – also known as poly pipes or PE pipes – are quickly becoming known as the most environmentally friendly pipes on …

A complete solution for BHP’s tailings storage facility

Adelaide piping solutions advanced piping systems Australia Australian mining BHP contractor collaboration copper mining Custom Fabrication custom-built piping systems environmental protection gold mining hazardous materials HDPE hydro-testing industrial fittings industrial piping industrial projects local business advantage mining industry expertise mining infrastructure mining project success mining sector mining solutions Olympic Dam one-lift solution pipeline solutions piping solutions Poly Pipe polyethylene fabrication Prefabrication prefabrication solutions project delivery project management quality assurance steel and poly pipes steel skid structures tailings storage facility tailored solutions uranium mining

Supporting Australia’s mining sector with tailored solutions, expert service and a commitment to excellence. The team at Advanced Piping Systems has been proudly supplying BHP’s …